• After Works
  • Before & During Works

Swap failed generator for new one.

Client: RBSProject Value: £15kProject Period: April 2012

Description

The existing building generator had failed and parts were no longer available because the unit was so old. It was more cost effective to replace the generator.

Works

• Disconnect the old generator and crane out of position • Crane in new generator • Move into position • Connect up new Generator • Commission new generator and full load test