Construction of a new compound and concrete slab and installation of a new 10,000 litre tank to provide 5 days run time for the generators in the event of a power failure.

Client: RBSProject Value: £20kProject Period: March 2012

Description

Installation of new 10,000 litre oil tank. Construction of a new compound, installing a concrete slab and pipework.

Works

• Removal of topsoil and dig out of foundations for the new slab base and compound walls. • Installation of a concrete slab base for the tank • Construction of walls to form the extention to the compound • Rendering & painting of new compound walls • Positioning of new oil tank via crane. • Manufacturing of pipework including tanker filling point • Connection of pipework to generator